Back to This Old House
Season 35

Season 35

2013
26 Episodes

Jersey Shore Rebuilds 2013; Arlington 2014

Episodes

No Image
1

1. Jersey Shore Rebuilds 2013 Part 1: Sandy and the Jersey Shore

Oct 5, 2013

For the first time, This Old House takes on three homes at the same time. The team meets the homeowners and discusses rebuilding stronger, smarter, and safer.

No Image
2

2. Jersey Shore Rebuilds 2013 Part 2: Drastic Measures

Oct 12, 2013

The team discusses how FEMA impacts building requirements, and foundation options. The Manasquan home is razed. Kevin takes a tour of Bay Head. Trouble begins at Point Pleasant.

No Image
3

3. Jersey Shore Rebuilds 2013 Part 3: Getting to Work

Oct 19, 2013

The Mantoloking home is examined from a new angle while the Bay Head house begins framing. The team learns about a innovative foundation to be used on the Point Pleasant home. And the shows visits a business in Bay Head that has already successfully rebuilt.

No Image
4

4. Jersey Shore Rebuilds 2013 Part 4: Built for Speed

Oct 26, 2013

The show visits the boardwalk at Seaside Heights to view reconstruction. The Bay Head home has a new deck installed. The Point Pleasant project gets crushed! A visit to the factory that will make the Manasquan house in only one week.

No Image
5

5. Jersey Shore Rebuilds 2013 Part 5: Lines in the Sand

Nov 2, 2013

The windows are installed at the Bay Head house. At Point Pleasant a new dinning room is installed in place of the garage. And the modular home arrives on site in Manasquan.

No Image
6

6. Jersey Shore Rebuilds 2013 Part 6: Go With the Flow

Nov 9, 2013

Breakaway walls and flood vents are installed at the Point Pleasant. The work on the modular home continues. What plants and trees survived Sandy?

No Image
7

7. Jersey Shore Rebuilds 2013 Part 7: Stories From Sea Level

Nov 16, 2013

Footings are added in Bay Head home. Point Pleasant gets stone veneer, fiber-cement siding and composite decking. Manasquan project is finished. Pro surfer Sam Hammer visits the show. And marine biologist Chris Wojcik talks about the bay.

No Image
8

8. Jersey Shore Rebuilds 2013 Part 8: One Year Later

Nov 23, 2013

A tour of the Mantoloking project. And the wrap party for the Jersey Shore projects.

No Image
9

9. Arlington 2014: Part 1: A New Project

Jan 2, 2014

The crew begins work on Italianate-style home originally dating to 1872.

No Image
10

10. Arlington 2014: Part 2: Old House Discoveries

Jan 9, 2014

Richard visits a water tank that has been disguised as a Greek temple. During demolition, the crew finds traces of the past. Roger moves a rhododendron .

No Image
11

11. Arlington 2014: Part 3: Concrete Jungle

Jan 16, 2014

Kevin, Norm, Tom, and mason Mark McCullough replace the substandard foundation by pouring a new slab and curb, all while preserving the antique fieldstone foundation. The crew also finds headroom and original plaster details in the living room.

No Image
12

12. Arlington 2014: Part 4: Quest for a Dry Basement

Jan 23, 2014

Tom joins the home's new roof to the existing. Architect David The architect explains how much change an 200 additional square feet the house. The existing fieldstone foundation gets additional repairs and waterproofing. Roger tours a nearby Garden. Norm and Tom repair the front door.

No Image
13

13. Arlington 2014: Part 5: Getting to Level

Feb 1, 2014

Leveling the ceiling in the kitchen and the floor in the finished basement is explained. An opening for a new window is cut. Landscape architect Cricket Beauregard explains what to do with a shady front yard.

No Image
14

14. Arlington 2014: Part 6: Additional Details

Feb 8, 2014

The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.

No Image
15

15. Arlington 2014: Part 7: Arlington Heights

Feb 15, 2014

Selective tree pruning occurs in the yard. Inside, Richard explains the choice between PEX and copper for water supply lines. Kevin tours an 1872 Stick Style home.

No Image
16

16. Arlington 2014: Part 8: Italianate Inspiration

Feb 22, 2014

Exterior colors are proposed. A tour of a nearby 1870 Italianate style home. Richard shows a more attractive approach to PVC vents. Tom shows his favorite applications for radiant heat.

No Image
17

17. Arlington 2014: Part 9: Deadliest Old House?

Mar 1, 2014

A "Deadliest Catch" star drops by to help with plaster cracks. Making the second floor railing safer.

No Image
18

18. Arlington 2014: Part 10: Old World New World

Mar 8, 2014

Installing steps with ice. More plaster repairs. The use of 3D-printing for home repair. Review of the front porch design.

No Image
19

19. Arlington 2014: Part 11: House vs. Nature

Mar 15, 2014

A hydrangea that is damaging the foundation is removed. Painting with red paint. How to keep the basement dry.

No Image
20

20. Arlington 2014: Part 12: Water Water Everywhere

Mar 22, 2014

A visit to Spy Pond in Massachusetts. A new water main is installed. Chestnut flooring is selected. Fiberglass gutters that appear appropriate to the historical period are installed.

No Image
21

21. Arlington 2014: Part 13: Brick, Trim and Tile

Mar 29, 2014

A sidewalk is prepared. Custom moldings are installed. Tiles are picked by the homeowner. New doors and countertops are installed.

No Image
22

22. Arlington 2014: Part 14: Soapstone, Marble, Oval Picture Frame

Apr 5, 2014

Adding the final edge detail to soapstone countertops; cutting down 12-inch marble tiles for wainscoting; oval mirror frame; oak stair treads; darkening soapstone countertops with carnauba wax and walnut oil.

No Image
23

23. Arlington 2014: Part 15: Made in the Shade

Apr 12, 2014

Installing a custom PVC fence and arbor; creating a marble herringbone pattern in the powder room; grout options for the faux slate floor in the mudroom; building a sliding barn door; alternatives to the usual shade plants.

No Image
24

24. Arlington 2014: Part 16: Decorative Details

Apr 19, 2014

A teak island top is installed in the kitchen; a vanity top is added to the master bath; an electronics nook is built; the pebble tiles on the shower floor are grouted; handmade wallpaper is hung; and a new front door is installed.

No Image
25

25. Arlington 2014: Part 17: Sod, Garbage Disposers, Crown Molding

Apr 26, 2014

A truckload of fresh sod is rolled out; a replica ceiling medallion made with a 3D printer and a custom copper vent hood are installed; a garbage disposer is selected; a pedestal sink is installed in the powder room; and storage space in the master closet is maximized. Also: a lesson in crown molding.

No Image
26

26. Arlington 2014: Part 18: Italianate Renaissance

May 3, 2014

The Arlington Italianate project concludes with a look at how the master bath was modified to accommodate a steam shower; a tour of the basement, bedrooms, baths and laundry spaces; and an overview of the decor choices.